Energy & Pulse / Policies & support
BESS Research Workflow Preview
A free introduction to an evidence-aware BESS research workflow. This page is a standalone demonstration, not an excerpt of the paid files. The numerical example below is fictional and must not be used as market data.
1. Start with a decision
Example research question: which opportunities in a selected battery-storage market merit further diligence? Set the country or power-market boundary, reference date, technology scope and decision criteria before asking AI to analyse sources.
2. Build an evidence log
Copy these fields into your own spreadsheet. Leave unavailable facts blank and mark them as unverified.
| Field | What to record |
|---|---|
| Source ID and URL | Stable identifier and original document link |
| Publisher and date | Who published it, when, and when you checked it |
| Claim and location | The relevant fact and page, section or table |
| Scope and units | Market, period, MW or MWh, and project identity |
| Status | Announced, qualified, awarded, contracted, construction or operating |
| Evidence type | Reported fact, calculation, estimate, company claim or inference |
| Open question | What still needs verification before a decision |
3. Try a bounded research prompt
Using only the source material I provide, extract each project’s identity, geography, power capacity, energy capacity and status. Cite a Source ID and page or section for every material claim. Do not invent missing values or links. Flag duplicates and conflicting dates. Separate facts from calculations and inferences. End with the evidence gaps that prevent a recommendation.
Paste only material you are authorised to share into your chosen AI service. AI output still requires review against the original documents.
Illustrative output: why status matters
Fictional example: a 100 MW / 200 MWh project appears in a developer announcement. Power is 100 MW; stored energy is 200 MWh; implied duration is 2 hours if both capacities use compatible definitions. None of those values proves the project is operating. Record the status as announced until stronger evidence supports a later stage.
Decision memo: retain the project as a research lead; do not count it as operational capacity. Next checks: official award or permit, grid connection, financing and commissioning evidence. This is a demonstration of reasoning, not a real project assessment.
What the paid toolkits add
The five toolkits organise the work into numbered prompt cards, editable workbooks, database structures, workflow instructions and quality checks in English and Simplified Chinese. They do not include a live market-data subscription. Review each product’s exact file list and licence before purchasing.
Start with Core Market Intelligence → · Compare all five toolkits
中文:先体验一条可核查的储能研究流程
这是独立制作的免费流程演示,不是付费文件节选。上面的 100 MW / 200 MWh 为虚构案例,不可作为市场数据使用。
- 先定义决策、目标市场、统计时间与技术范围。
- 每个结论记录来源编号、原始链接、日期、页码、单位和项目阶段。
- 要求 AI 只分析你提供的材料;缺失信息标记待核实,不补造数字和链接。
- 把公告、授标、建设和投运分开统计;先补齐证据,再提出建议。
完整工具包提供中英文提示词卡、可编辑工作簿、数据库结构及核验流程,适用于全球市场研究;各国政策和项目数据需要你自行收集并核实。